Foundation

Photos from the foundation work done by Stoebe Enterprises.

Avani Zaidi



Excavation for foundation trenches





Block wall for supporting the small container





Pouring concrete





Stem Walls for supporting the shipping containers (South West Elevation)





Stem Walls for supporting the shipping containers (South East Foundation)





Pouring concrete for the slab foundation

Thursday, January 29, 2009

Septic System

Pictures of the Septic System Installation done by KB Engineering.

Avani Zaidi



Concrete Rings for the Seepage Pits





First Seepage Pit





Second Seepage Pit





The Septic Tank

Wednesday, September 3, 2008

Updated Project Timeline

Here is the updated project timeline of all the tasks that we have completed so far and the tasks that are remaining (in red). The remaining tasks that are in italics are the ones currently being worked on.

Please use the Timeline link under PLANS to get a better view.

Thanks,

Avani Zaidi

Monday, September 1, 2008

Container Fabrication - Part 2

The four shipping container for the first and second floors are almost done. The are still on site at AAA Container's yard in Fontana, CA. They will be shipped to the lot once the foundation is ready.

Here are some pictures.

Avani Zaidi



First floor - south container with the cutouts for front door and windows.





Finished first floor - south container.





First floor - north container.





Second floor - south container with the opening for loft's sliding door and bedroom windows.





Side view of the second floor - south container.





Second floor - north container.





Back side of the second floor - north container. It will be connected to the corresponding south container.