Here is the updated project timeline of all the tasks that we have completed so far and the tasks that are remaining (in red). The remaining tasks that are in italics are the ones currently being worked on.
Please use the Timeline link under PLANS to get a better view.
Thanks,
Avani Zaidi
Showing posts with label project. Show all posts
Showing posts with label project. Show all posts
Wednesday, September 3, 2008
Monday, July 28, 2008
Become a Vendor
We are currently accepting bids for,
For inquiries, or if you are a sub-contractor specializing in any of these areas and would like to send in your bid, please contact Jonah Swick at,
Thanks,
Avani Zaidi
Foundation
Septic
Plumbing
Underground Utilities
Electric
HVAC
Roofing
Drywall
Insulation
Interior Paint
Flooring
Windows & Doors
Cabinets & Counters
Kitchen & Bath
Fixtures
Exterior Stucco & Paint
Landscaping & Boundary Wall
For inquiries, or if you are a sub-contractor specializing in any of these areas and would like to send in your bid, please contact Jonah Swick at,
Jonah Swick
Oasis Construction & Design
909-762-6471
jbswick@gmail.com
Thanks,
Avani Zaidi
Labels:
contractor,
project,
supplier,
vendor
Friday, July 25, 2008
Project Timeline
This is a very detailed outline of all the tasks that we have completed so far and the tasks that are remaining (in red). The remaining tasks will be elaborated as we move on.
The main motivation behind this project timeline was the fact that there is very little information available for folks like us that doing this for the first time. This has been a major learning experience for us. There are lots of things that we learned along the way, and are still learning. This construction plan tries to document all those steps along with their associated costs.
The other motivating factor was our tight budget. We want to make sure everything is under control and accounted for as much as possible.
Please use the Timeline link under PLANS to get a better view.
Thanks,
Avani Zaidi
The main motivation behind this project timeline was the fact that there is very little information available for folks like us that doing this for the first time. This has been a major learning experience for us. There are lots of things that we learned along the way, and are still learning. This construction plan tries to document all those steps along with their associated costs.
The other motivating factor was our tight budget. We want to make sure everything is under control and accounted for as much as possible.
Please use the Timeline link under PLANS to get a better view.
Thanks,
Avani Zaidi
Labels:
complete,
construction,
cost breakdown,
project,
schedule,
timeline