Wednesday, September 3, 2008
Updated Project Timeline
Please use the Timeline link under PLANS to get a better view.
Thanks,
Avani Zaidi
Monday, September 1, 2008
Container Fabrication - Part 2
Here are some pictures.
Avani Zaidi
First floor - south container with the cutouts for front door and windows.
Finished first floor - south container.
First floor - north container.
Second floor - south container with the opening for loft's sliding door and bedroom windows.
Side view of the second floor - south container.
Second floor - north container.
Back side of the second floor - north container. It will be connected to the corresponding south container.
Excavation and Grading
We are putting in a septic system tomorrow (Sept. 2nd, 2008) and then do the final grade.
Here are some pictures from the site.
Enjoy,
Avani Zaidi
Start of the grading, working on the east side of the lot.
Excavating the site, moving the soil.
Rough grading done for the courtyard entry and the living room (for concrete slab foundation).
Shipping containers will be set on raised foundation, south of the concrete slab.
Space for the kitchen and family room which will also be on a raised foundation.
Backyard, now almost at the same grade as the house.
All the boulders and rocks from the excavation.