Here is the video of the second floor containers that were installed on Mar. 7th 2009. You can also watch the video directly on www.youtube.com at,
http://www.youtube.com/watch?v=RYpN1peR2f4
Avani Zaidi
Sunday, March 22, 2009
First Floor Containers - Installation
Here are the photos of the first floor containers that were installed on Jan. 10th 2009.
Avani Zaidi
Avani Zaidi
Lesli from CDEG directing the traffic
South container ready to be moved
Getting rear fork lift in position
Turning the container towards the gate
Erik (our architect) from CDEG making sure the container is aligned right
Jonah holding off the traffic on the other end
Placing wood blocks underneath the container
Crane ready to move the container in its place
Foundation
Photos from the foundation work done by Stoebe Enterprises.
Avani Zaidi
Avani Zaidi
Excavation for foundation trenches
Block wall for supporting the small container
Stem Walls for supporting the shipping containers (South West Elevation)
Stem Walls for supporting the shipping containers (South East Foundation)